docs(stalwart): record completed 0.16.8 cutover #575

Open
lytedev wants to merge 2 commits from stalwart-016-cutover-docs into main
Owner

Records the completed 2026-06-10 cutover in the issue file: Phase A/B results, the UniFi :8080 recovery-port hiccup, verification checklist, and remaining post-tasks (reindex, quotas, cert-renewal gap).

Records the completed 2026-06-10 cutover in the issue file: Phase A/B results, the UniFi :8080 recovery-port hiccup, verification checklist, and remaining post-tasks (reindex, quotas, cert-renewal gap).
Claude only includes session_title in SessionStart hook payloads, so a
title set mid-session (auto-naming or /rename) never reached the hook
and the zellij tab stayed on the project:petname fallback until the
next --resume.

Fall back to the most recent custom-title entry in the transcript
(transcript_path is in every hook payload), so renames land on the next
hook event. Also clean up the session state file written under the old
name when the name changes, so renames don't leave phantom sessions.
docs(stalwart): cutover to 0.16.8 completed 2026-06-10
All checks were successful
/ check-format (push) Successful in 7s
/ build (push) Successful in 5m49s
90a984ba42
Phase A: recovery-mode migration (STALWART_RECOVERY_MODE_PORT=18080 to
dodge UniFi on :8080), export replay (4 accounts, domain, cert), listener
bootstrap. Phase B: deploy + stalwart-apply reconcile, zero failed ops.
Verified listeners/IMAPS/inbound-SMTP/OAuth/JMAP/admin-UI/autoconfig.
Remaining post-tasks tracked in the issue (reindex, quotas, cert-renewal
gap follow-up).
All checks were successful
/ check-format (push) Successful in 7s
Required
Details
/ build (push) Successful in 5m49s
Required
Details
This pull request can be merged automatically.
This branch is out-of-date with the base branch
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin stalwart-016-cutover-docs:stalwart-016-cutover-docs
git switch stalwart-016-cutover-docs
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
lytedev/nix!575
No description provided.